Original Project Objectives

The project undertaken by Barton Engineering & Export Ltd at the British Embassy Yangon, Myanmar was structured around an initial key objective which was to replace the existing air conditioning systems of which there were numerous ‘Split’ type designed units in a rapidly deteriorating condition. The climate in this region demands consistent and reliable cooling to maintain comfortable conditions within the building for both staff and the public.

Barton Engineering British Embassy Myanmar before

Additional Project Objectives

Prior to mobilising the construction phase of the air conditioning replacement project, an assessment was made of the asbestos present within the pitched roof. An initial mandate was given to remove approximately 50m2 and investigate further to clarify the situation.